COB 12.2.2
An Operator of a Scheme must obtain the DFSA’s prior written approval for:
(a) that Scheme before it operates the Scheme in or from the DIFC; and
(b) any material change to the Scheme after it has been approved under (a).
Derived from DFSA RMI261/2019 (Made 18th December 2019). [VER35/01-20]
[Added] DFSA RMI302/2021 (Made 30th June 2021). [VER38/09-21]
[Added] DFSA RMI302/2021 (Made 30th June 2021). [VER38/09-21]